The Journey (COC Building Program)

We chose the theme, The Journey, to describe our partnership with God as He provides the funds for us to construct a new worship center.  We began construction of this new facility in January of 2002 and since then, we have watched as God provided over $780,000 to pay for the construction, a debt-free building project.  The new building connects with our existing office and education building creating a huge foyer between the two.  In addition to a 450 seat worship space, new restrooms, classrooms, and a library are included.  

On November 18th we moved into the new building!
First Sunday in new worship center (11/18/07)New Worship Center

 



 

 

 

Progress Report

The Journey continues as we wait on God to provide the additional finances needed to complete the project.

Items still needed:
            *   Worship Center Seating                  *   Office remodeling
            *   Carpet for Nursery                            *   Video Projection System
            *   Carpet for Library                              *   Furnishings for Nursery
            *   Exterior Brick (to tie in new building with existing building)

December 2007
Another "11th hour" delivery.  The carpet arrived on Friday afternoon, December 1st,  and volunteers scrambled all day Saturday to prepare the room for worship.

Carpet arrives

Volunteers work to get room ready for worship

 

 

 





New carpet on steps

November 2007
The call came in the "11th hour" that we will be able to use the new worship center on Sunday, November 18th.  Volunteers appeared out of nowhere and helped get the room ready for worship.

Carpet Installed 12/07


Setting up chairs in new worship centerSetting up chairs in new worship center

 

 

 

 

 

Setting up sound system

 Volunteers complete last-minute tile work

 

 

 

 

Volunteers sealing grout in bathrooms

Cleaning for first service in new worship center

 

 

 

 


Getting ready for first Sunday in worship center

Little helper getting worship center ready

 

 

 

 

 

A crew is installing tile in the foyer                 Foyer Tile Installation1Foyer Tile Installation 2

 

 

 


 

Volunteers prepared flooring for carpetPreparing floor for carpet
 Volunteer preparing nursery floor for carpet

 

 

 

 


Volunteers moved the grand                              A crew installed the flooring
piano into the new worship center.Grand piano being transported                   on the stage.Stage flooring installation

 

 

 

 

Lifting grand piano to its new home

Volunteers lift the grand piano to its new home

 

 

 


Volunteers installed the new organ speakers.  Installing Organ SpeakersVolunteers installing organ speakers

 

 

 

 

 

 

October 2007
Crews  painted, installed doors and trimwork. Final door hardware installation, bathroom plumbing, and foyer tile work were nearing completion. 

September 2007Worship Center Entry Doors
Volunteers installed most of the trim and the entry doors.  Volunteers continued to paint.  Crews installed bathroom tile and painted trim.

 

 

 

Worship Center Trim

Worship Center Bathroom Tile

 

Crews put the finishing touches on the tilework and trim.

 


 

August 2007
Painting was completed  The fire alarm system was installed.  The stage steps were completed.  Tile was  installed in the bathrooms. Interior doors and trim were installed.

Worship Center Steps 1

Worship Center Steps 2

 

 

 

 

 

Worship Center Beams

Worship Center Foyer

 

 

 

 

 

 

May 2007
Worship center and foyerMay 07 Worship Center Construction
May 07 Foyer Construction

 

 

 

 


April 2007
Professional crew installed drywall
Drywall Crew 1Drywall Crew 2

 

 

 

 

 

Drywall Crew 3

Crew applied spray-on insulation on ceiling

April 07 Construction Ceiling

Insulation Crew 

 

 

 

 

Spray Insulation 2

Volunteers installed drywall


Drywall Installation 7 Drywall Installation 2

Drywall 4 Drywall Installation 5


 March 2007
Volunteers prepared overhead lights for application of foam insulation

March 30 Construction 1 March 30 Construction 2 

March 30 Construction 3

Volunteers installed insulation in preparation for drywall.

Insulation Insulation Crew 2

Installing Insulation Installing Insulation

 Volunteers prepared exterior for insulation

Mar 27 Construction  Construction

The crew from AEP installed the new transformer for the new worship center

Construction - Transformer Installation Construction - Transformer Installation 2

AEP Crew Installing Power to Transformer AEP Crew Installing Power to Transformer

 AEP Crew Installing Power to Transformer


 Volunteers made modifications for installation of sound components.

Trenching Sound Conduit b (3/07)

Trenching Sound Conduit (3/07) Trenching Sound Conduit

September 2006 
Electricians installed light fixtures

Electricians1  

 A crew of volunteers installed the baptistry in the new worship center
(August 2006)

 BaptistryInstall BaptistryInstall2
BaptistryCrew

Recent baptism
BaptisteryInstall

 December 2005 
Stage construction  

StageConstr1

 Heating and Air Conditioning contractors installed ductwork.

AC Contractors

  Inside the 450 seat worship center.

Seating

 July 2006
Workers poured concrete on walkways

Pouring Concrete 2 Pouring Concrete 1 

Pouring Concrete 3 Concrete4

 Concrete9 Concrete14

 Concrete13

JUNE 2007 UPDATE
The following projects wereunder construction:
Bathrooms, interior fire-rated doors, trim, electrical final.